- Operations
- New power cabling
The room is now back to normal (minus NetApp)
- Should we have another circuit installed in the room?
- Then we'd be back to 30A for each rack
- Best time for them to do this?
- Serial network
- Dongles have arrived
- But they still need to be doctored
- Need to correctly enter machines into serial server
- Get rid of domUs from the registry
- How do we integrate the Cyclades in Rack 6?
- Dongles have arrived
- Cable control
- Rack 2 now looks much better
- Rack 0 under switch still very scary
- We need more ties
- New power cabling
- Projects
- Website
- Strategy: Statically executed PHP files
- Pictures of machine room
- More information about what we do and who we are
- Wheezy
- Are we ready to build dom0s?
- If we can create two or three Wheezy dom0s we can start rebuilding core services remotely
- Website
- Demosplash
- Invite is under development
- Website theme almost finished