Boring part
Spring 2016 Talk Series — Wednesdays 20:00, WeH 5421
Tomorrow, 20 Apr – bescott with CoffeeScript => WebGL Solar Systems!
- Next week, 27 Apr – jpdoyle with Real-Time 3D Graphics from the Ground Up
- Treasurer's report
Tentative FY2017 budget after 1st-round appeals
- Revised up to $2891 ($391 non-capital + $2500 capital)
- Demosplash food is properly zeroed out now
- No funding for machine room enhancements or retrocomputing; just maintenance and upkeep
- Unspent capital for FY2016
- Purchasing
- New requests
8-Pin EPS Extension Cable (~$13.50, Amazon)
4 Pin Fan Power Extension Cable (~$2.50, Amazon)
Tartan is willing to donate an APC NetShelter AR203 once grantwu migrates everything currently on it.
- Previously deferred
- Second new rack, to replace Rack 2 (~$400)
Power transfer switches (~$605, Amazon)
- We need to decide whether/how we're going to purchase these soon, if we intend to get them with FY2016 funds
- New requests
- Retrocomputing Committee report
- Retro Gaming Night wrap-up
- Budget shenanigans
- Prize distribution
- Demosplash planning
Are we meeting before finals or not? (when2meet)
- Retro Gaming Night wrap-up
- Meetings
- Problems
- Long
- Boring
- Both a result of too much fact-gathering and brainstorming going on, and probably other reasons too
- Suggested changes
- Do more stuff over email, on members@
- New policy: Purchasing requests should be mailed to members@ at least 3 days (i.e. after Saturday) before Tuesday
- Endeavor to discuss other stuff on members@ as well
- Discuss operations on an official meeting on Saturday
- Do more stuff over email, on members@
- Problems
Interesting part
- Open Hacking Hours
- Future events
Tue 3 May, 21:00, Rashid – Movie night: Mystery Science Theater 3000 Overdrawn at the Memory Bank
- Operations
- mjrosenb's hardware
- An X8SIL and an X8SIL-F
- 48 GB of ECC RAM
- Tested on Saturday, both work
- Need power/fan extension connectors
- Need a different CPU heatsink if we use the 1U case
- SSL certificate renewals
- Certs for contrib expire Fri 29 Apr
- tparenti is working with mdille on this
- engine01 – Build status update from grantwu?
- Works. Nix installation postponed indefinitely until installation is less fragile.
- transit-2 (and the former kvm04) – Build status update from aliruu?
- Installer crashes on former kvm04, worked on other machines (possibly dead 2950)
- storage-4
- stroucki is not here
- Switch fan installations
- Should we do this on 23 or 30 Apr? (kbare out-of-town 23 Apr)
- mjrosenb's hardware