Boring part
Spring 2016 Talk Series — Wednesdays 20:00, WeH 5421
- All set to go
- Treasurer's report
- JFC: not much happened
- Purchasing
- Approved
X68000 hard disk power connector ($0.61 total, Digikey)
- lroop ordered; has arrived; will be installed Saturday
12-bay rackmount server case for storage-4 (~$725, Newegg)
- stroucki ordered; has arrived; blocking stroucki's office door
- New requests
Adjustable shelf rails for the new rack (~$45 ea, DeepSurplus; or $28 Amazon)
- may have a few lying around, let's look for those
- still need these anyway
- serial console will need to be moved
- let's get 5
- Deferred
Power transfer switches (~$605, Amazon)
- Other retro?
- Micomsoft XFC-4 video scan converter
- XSIMM-10 RAM adapter
- Approved
- Retrocomputing Committee report
- see above
- leee's machines
- no update
Interesting part
- Open Hacking Hours
- Operations
Status of NNTP peering request from CompServ
- we are actively setting up Usenet peering
- New KVM vm server
- Setting up a documented kvm server install
- stroucki and areese used KVM 04 as an example, added new documentation
- storage isn't RAIDed, documentation needs to describe how to set up RAID, NTP, smart checks, and networking
New rack installation, replacing Rack 0
- This Sat, 13 Feb:
- Move all machines
- backups, tungsten, gadolinium to Rack 4
- backups can be moved at any time
- wikium can be moved at any time
- tungsten and gadolinium run a lot of services
- don't have simultaneous downtime on both
- mailservers and nameservers will have short downtime
- we might be able to get downtime down to a few seconds
- wikium to Rack 5 or 6, whichever space allows
- backups, tungsten, gadolinium to Rack 4
- These machines house 2/3 mailservers, 2/3 nameservers, 1/2 web nodes, 1/2 load balancers, IMAP, AFS volumes, Nagios, Jabber, wiki
- Move all machines
- Try to move network switch as well
- Minimal (or no) downtime to each machine should be needed
- This could still affect performance of visible services, so send an announcement anyway
- Looking forward:
- What to do with switch and power distribution still on the old rack
- How to remove old rack, set up new rack
- Which machines to move to new rack
- This Sat, 13 Feb: